Service area

Construction inChelan, WA

Concrete, remodeling and finish work in Chelan. Start with the project, then confirm the permit desk and site-specific design criteria.

Local numbers, with the conditions

County frost depth 24in

Chelan County's climatic and geographic design criteria sheet lists a frost line depth of 24 inches, the same figure in both the residential table (for use with the International Residential Code) and the commercial table. The sheet adds that all design criteria is site specific. Chelan County

Ground snow load 50psf

The City of Chelan design criteria sheet lists a ground snow load of 50 psf and a roof snow load of 40 psf for building inside the city limits. the City of Chelan

Snow load threshold 950ft

Chelan County's building design criteria sheet sets ground snow load by elevation for sites the county permits, outside city limits. Chelan County

Deck permit trigger 30in

Inside the City of Chelan, the building department's list of common examples of work that needs a permit includes carports, decks more than 30 inches above grade, dock repairs and additions, exterior doors, windows and skylights that require a new opening, rockeries and restraining walls over 4 feet in height, re-roofs, and window replacement where the window frame has been replaced or where the opening has been enlarged or safety glass or egress code is required. the City of Chelan

Shed exemption 200sq ft

The City of Chelan Building Department's tip sheet "Permits: When Required", which the city still publishes as its 2015 IRC edition, lists as common examples of work not requiring a permit: one-story detached accessory structures used as tool and storage sheds not exceeding 200 sq. ft. the City of Chelan

Permit clock 180days

In the City of Chelan, a building permit issued under the International Building Code expires and becomes null and void if the work it authorizes is not commenced within 180 days from the date of the permit, or if the work is suspended or abandoned for 180 days after it has been commenced. the City of Chelan

What We Do Here

Nine trades, and if yours is not on the list, just ask.

Service page 1

Which permit desk handles your address?

Inside the city limits City of Chelan Building Department

Inside Chelan city limits the permit desk is the City of Chelan Building Department. The Building Department sits under the city's Community Development Department. The office is at 135 E Johnson Ave. the City of Chelan

Outside the city limits Chelan County Community Development

The county building desk is at 316 Washington Street, Suite 301, Wenatchee, WA 98801. The main line is (509) 667-6225 and inspections are (509) 667-6635. Chelan County

What Our Clients Say

A 5.0 rating on Facebook and Google and Yelp from the homeowners and site managers Worley has worked with.

John has done several jobs for us, from restoration to handyman work, and we've always been very happy. He's honest, trustworthy, reliable, and gets the job done right the first time. We definitely recommend him!

Autumn Mendoza

Great service and communication! They came out to our multi family site and were very professional in their interactions and the quality of work was amazing!

Aneisha

See all reviews

Other Areas We Serve

Based in East Wenatchee, working the Columbia corridor from Malaga and Rock Island north to Chelan, plus Waterville.

Map of the Worley Construction service area with Chelan highlighted, along the Columbia corridor from Malaga and Rock Island north to Chelan, plus Waterville.

See the whole service area

Before you plan the work

Questions

Building in Chelan

The details behind the local numbers and permit decisions.

How deep do footings go inside the Chelan city limits?

Chelan County's climatic and geographic design criteria sheet lists a frost line depth of 24 inches, the same figure in both the residential table (for use with the International Residential Code) and the commercial table. The sheet adds that all design criteria is site specific.

Note that this is the county's sheet; the City of Chelan publishes separate design criteria for work inside city limits. Chelan County

What snow load does a roof inside the Chelan city limits have to carry?

The City of Chelan design criteria sheet lists a ground snow load of 50 psf and a roof snow load of 40 psf for building inside the city limits.

the City of Chelan

What work needs a building permit inside the Chelan city limits?

Inside the City of Chelan, the building department's list of common examples of work that needs a permit includes carports, decks more than 30 inches above grade, dock repairs and additions, exterior doors, windows and skylights that require a new opening, rockeries and restraining walls over 4 feet in height, re-roofs, and window replacement where the window frame has been replaced or where the opening has been enlarged or safety glass or egress code is required.

the City of Chelan

How long does a building permit stay valid inside the Chelan city limits?

In the City of Chelan, a building permit issued under the International Building Code expires and becomes null and void if the work it authorizes is not commenced within 180 days from the date of the permit, or if the work is suspended or abandoned for 180 days after it has been commenced.

Each approved inspection advances the expiration date 180 days from the date of the last approved inspection. the City of Chelan

You’re In Good Hands

A general specialty contractor registered in Washington since 2021 and rooted in the Wenatchee Valley.

About Worley Construction

Covered patio slab with a view to parked trucks and a trailer.

Ready to get it done?

Estimates are free. Tell Worley what needs to be built, poured, repaired, or finished.