What matters before the work

A kitchen or a bathroom is priced by what moves, not by floor area. Cabinets, counters, flooring and fixtures replaced in the footprint they already occupy is one kind of job.

The order of a remodel is close to fixed. Demolition, then any structural work, then rough plumbing, wiring and ducting while the walls are open, then inspection where permits apply, then insulation, drywall and the first coats of paint. Cabinets are set and leveled, and only after that does anyone template the countertop.

The climate shows up in the finish work. Summers in the valley are long, hot and very dry, with under ten inches of precipitation in a year, so joint compound, caulk, adhesive and paint flash off faster than the label assumes and the working window is short.

Questions

Remodeling questions

The practical questions worth settling before the work starts.

What actually decides the cost of a kitchen or bathroom remodel?

Three things, mostly. The first is whether anything moves. Fixtures and cabinets replaced where they already sit price one way, and relocating a sink, a toilet or a range means opening the floor to reroute drain with enough fall, which is a different job.

How can a homeowner tell whether a wall carries load?

There are signs worth reading before anyone opens anything. Bearing walls usually run across the floor joists rather than parallel with them, so joist direction seen from a crawlspace or an unfinished basement is the first clue.

How long is a kitchen out of use during a remodel?

Longer than demolition and the cabinet install suggest, because of the countertop.

What needs a permit, and which parts are separate trades?

Structural changes, new circuits and new plumbing lines are permitted work, and in Washington the electrical permit and inspection run on their own track alongside the building permit from the local jurisdiction.