Concrete, remodeling and finish work in Malaga. Start with the project, then confirm the permit desk and site-specific design criteria.

Local numbers, with the conditions

Ground snow load 57psf minimum

Chelan County sets a ground snow load of 57 psf minimum, and that number is a floor rather than a single county-wide figure. Chelan County

Permit valid 2years

Chelan County permit timing: a building permit application is valid for 6 months, and the application period can be extended an additional 6 months as long as the applicant pursues the permit in good faith, in 3 month increments for residential projects and 6 month increments for commercial projects. Chelan County

Permit term 2years

Malaga sits in unincorporated Chelan County, so the county permit clock is the one that applies. Chelan County

Frost depth 24in

Chelan County's climatic and geographic design criteria sheet gives, for the residential table: wind speed 110 ultimate, seismic design category C and D, weathering Severe, frost line depth 24 inches, termite Moderate, decay Slight, winter design temperature 5 degrees, ice shield underlayment required Yes, flood hazard Yes, air freezing index 1060, mean annual temperature 51. Chelan County

Driveway trigger 150ft

Washington's wildland urban interface building rules are keyed to wildfire mapping rather than to a fixed calendar date. RCW 19. 27. the state

Flood hazard Yes

Chelan County's climatic and geographic design criteria sheet lists Flood Hazard as Yes for both residential and commercial construction, with a note that all design criteria are site specific. Chelan County

What We Do Here

Nine trades, and if yours is not on the list, just ask.

Service page 1

Which permit desk handles your address?

Building permits Chelan County Community Development

The county building desk is at 316 Washington Street, Suite 301, Wenatchee, WA 98801. The main line is (509) 667-6225 and inspections are (509) 667-6635. Chelan County

Septic and site evaluation Chelan Douglas Health District

Onsite environmental health inspectors permit septic systems in Chelan and Douglas counties. Site and soil evaluations are completed by a licensed designer. the health district

What Our Clients Say

A 5.0 rating on Facebook and Google and Yelp from the homeowners and site managers Worley has worked with.

John has done several jobs for us, from restoration to handyman work, and we've always been very happy. He's honest, trustworthy, reliable, and gets the job done right the first time. We definitely recommend him!

Autumn Mendoza

Great service and communication! They came out to our multi family site and were very professional in their interactions and the quality of work was amazing!

Aneisha

See all reviews

Other Areas We Serve

Based in East Wenatchee, working the Columbia corridor from Malaga and Rock Island north to Chelan, plus Waterville.

Map of the Worley Construction service area with Malaga highlighted, along the Columbia corridor from Malaga and Rock Island north to Chelan, plus Waterville.

See the whole service area

Before you plan the work

Questions

Building in Malaga

The details behind the local numbers and permit decisions.

What snow load does a roof in Malaga have to carry?

Chelan County sets a ground snow load of 57 psf minimum, and that number is a floor rather than a single county-wide figure. The county's design criteria sheet states: "The default Ground Snow Load (GSL) for all areas of the county with an elevation of 950 feet or less shall be 57 PSF GSL.

" For parcels above 950 feet the county directs you to its GIS map at https://maps. Chelan County

How long does a building permit stay valid in Malaga?

Chelan County permit timing: a building permit application is valid for 6 months, and the application period can be extended an additional 6 months as long as the applicant pursues the permit in good faith, in 3 month increments for residential projects and 6 month increments for commercial projects.

An application not pursued in good faith expires and is cancelled. Chelan County

What do the zoning rules allow in Malaga?

Chelan County's draft Malaga UGA Plan, a July 14, 2026 memorandum prepared by Anchor QEA, states that the proposed UGA boundary "includes areas currently zoned Rural Village, Rural Residential Recreational, and Rural Industrial", and that "The majority of Malaga within the UGA boundary is zoned Rural Village".

In the plan's parcel-based housing estimate, the Rural Recreational/Residential and Rural Village zones "make up more than 85% of the Malaga LAMIRD's housing units". Chelan County

What design criteria does the climate set in Malaga?

Chelan County's climatic and geographic design criteria sheet gives, for the residential table: wind speed 110 ultimate, seismic design category C and D, weathering Severe, frost line depth 24 inches, termite Moderate, decay Slight, winter design temperature 5 degrees, ice shield underlayment required Yes, flood hazard Yes, air freezing index 1060, mean annual temperature 51. 5 degrees.

The commercial table matches it except that seismic design category reads D. Chelan County

You’re In Good Hands

A general specialty contractor registered in Washington since 2021 and rooted in the Wenatchee Valley.

About Worley Construction

Covered patio slab with a view to parked trucks and a trailer.

Ready to get it done?

Estimates are free. Tell Worley what needs to be built, poured, repaired, or finished.